• 2012
ETHYLENE UNIT TRANSPORTATION FOR NOVY URENGOY GAS CHEMICAL COMPLEX (PART OF GAZPROM PERERABOTKA LLC)

Total volume of cargo – 3500 cub.m

Besides other equipment, transportation of reservoir of 19.27 х 7.1 х 7.3 m and 108 tons from Fletchum (Germany) to Korotchaevo was arranged

Part of transportation route passed through Northern Sea route. The temporary beach landing was established at Korotchaevo for cargo discharging

CLIENT: GREENWAY-TRANSPORT LTD