• 2017
TRANSPORTATION OF HEAVYWEIGHT AND OVERSIZED MANUFACTURING EQUIPMENT TO BIGGEST RUSSIAN OIL-CHEMICAL COMPLEX

Total volume of cargo: 36 000 freight tons

Route: Gulf of Ob – Tobolsk (Russia)

Transportation stages:

  • sea fastening manuals for river pontoons, including tailor positioning of each item
  • echo sounding of Novy Port outer roads for safe transshipment operations
  • discharging of the cargoes from sea carriers to river pontoons at outer port roads
  • securing and lashing materials have been delivered to outer port roads for sea fastening
  • lashing, securing and welding on pontoons at outer port roads
  • 13 units of pontoons and tugs had been involved into delivery chain
  • a floating office had been arranged for operational control and paperwork at open waters of Novy Port

The significant part of project success lies in using of unique engineering solutions on equipment stowage, securing and transportation in the areas of Extreme North and severe polar conditions in open water surfaces.

CLIENT: DEUGRO PROJECTS

Leave a Reply

Your email address will not be published. Required fields are marked *