• 2016 - 2017
TRANSPORTATION OF BLOCK-MODULAR SYNTHETIC LIQUID FUELS (SLF) PLANT

Cargo:

  • 44 out of gauge items, the total weight – 558 tons, volume – 2611 m3
  • in-gauge items in 102 twenty-feet and 24 forty-feet containers

Route: CHOREN plant, Freiberg (Germany) — Ust-Kut (Russia)

Transportation stages:

  • Freiberg (Germany) – Port of Hamburg: by truck (except for the reactor of 95 tons and the column of 23 m long. These cargo items were transported by truck as far as the river port of Dresden (Germany) where they were put on a river barge and sent to the port of Hamburg (Germany)
  • Port of Hamburg – port of Saint-Petersburg: by sea
  • Port of St.Petersburg – Ust-Kut (the railway station of Lena): by truck and railroad

Features:

  • Dismantling and loading of the column and reactor in Freiberg were carried out for one day
  • Keystone Logistics LLC representative stayed constantly in Freiberg (Germany) and conducted the process of in-gauge items loading into containers

CUSTOMER: StroyBusinessGroup LLC