• 2017
SUBMARINE POWER CABLE TRANSPORTATION

Cargo: submarine power cable with total length of 17,270 m and weight of 296 tons

Route: Yalova (Turkey) – Corinth (Greece) – Astrakhan (Russia)

Stages and particulars of transportation:

  • Yalova port (Turkey): installation of two supports for cable winding, outer diameter of each support – 8,24 m, height – 2,7 m, weight – 9 tons
  • Corinth port (Greece): loading (winding) of two project lengths of cable (each 8,635 m long) onto supports
  • Astrakhan port (Russia): cable unloading onto cable-laying vessel

CLIENT: C-Transit, LTD

Leave a Reply

Your email address will not be published. Required fields are marked *